Paradise Pass Work Days

In preparation for the Indiana State Hoosier Ambush

 

Projects

 

September 2th

8:00 AM sharp (more or less)

 

 

Club House

install soffit & fascia

Well

Water line and electric from well to Club House

Sanitary drain line - 75% complete

Install hot water heater

Install shower

Install water closet

Install restroom sink

Electric from Club House to Stages 1, 2 & 3

Install entrance door to Ladies facilities!

 

Stage 1 - Gunsmith

Sheet inside walls

Electric - Porch, interior, target light fixtures and light switches.

Stain/seal exterior

paint interior walls

 

Stage 2 - Cantina

Sheet inside walls

Electric - Porch, interior, target light fixtures and light switches.

Stain/seal exterior

paint interior walls

 

Stage 3 - Saddler Funeral Home

Sheet inside walls

Electric - Interior and target light fixtures.

Stain/seal exterior

paint interior walls

 

Stage 4 - Saloon

Sheet inside walls

Stain/seal exterior

paint interior walls

 

Stage 5 - Restaurant

Stain/seal exterior

 

Stage 6 

Convert "old fort" into Knot OK Coral

 

Stage 8 - Sheriff's Office

Sheet inside walls

Stain/seal exterior

paint interior walls

 

Stage 10

Convert to new Fort Squeak

 

General Cleanup

Trim around all stages and boardwalks

Pickup debris from stage updates.

 

RV camping and Cabins

install underground electrical

 

 

 

 

Donated Materials Needed

100 - 120 straight metal fence posts for staking trees

metal roofing (not rusted through) good lengths

good railroad ties

solid telephone poles at least 8 feet long

Treated lumber (ask C.C. Top for sizes needed)

solid landscape timbers at least 6 feet in length

outside deck stain, any color if it's good

 

All labor and materials donated is 100% tax deductable according to C.S.A. code 34.3.paragraph 4 subsection VI per President Jefferson Davis.